What is a defects liability period?

A defects liability period is a set time after practical completion during which a builder must return and fix defects at their own cost. It is set by the contract, typically around 6 to 12 months, and sits alongside longer statutory warranty periods under state home building law.

During the period the owner notifies the builder of defects, and the builder must rectify them within a reasonable time. Any retention held is often released when the period ends, so a builder with open defects is also waiting on money.

The contractual period is separate from the statutory warranty periods that apply to residential building work. Those are set by state law and are longer for structural defects. As a guide used in our state compliance guides, major or structural defects can generally be raised for around six years in NSW, six and a half years in Queensland and up to ten years in Victoria, with shorter periods for other defects. These figures can change, so confirm them against the current legislation.

Handling the period well is mostly record keeping. Log each reported defect with a date, photos, who it was assigned to and when it was fixed. A defect that was reported and ignored is far more expensive than one that was reported and closed out quickly.

The period does not remove the builder's liability for work that was never complete. If a defect was visible at practical completion and should have been on the completion list, it is a completion issue and not only a defect.